Case Study #155 | Knowing Your Infrastructure

masthead-blue-ellipse-top masthead-blue-ellipse

In this Nationwide Powerâ„¢ (NPâ„¢) case study, we highlight the importance of knowing what your electrical infrastructure is, and what is supported by your UPS. This case study specifically looks at the Eaton Powerware 9330-15kVA UPS.

Product9330-15kVA UPS
Application911 Center
SynopsisAn existing customer placed a service call stating their Eaton 9330 UPS went into bypass and that there was an electrical smell in the room.
Preliminary ActionsInitial phone troubleshooting was not able to place the unit back online, so one of our Critical Power Professionalsâ„¢ (CPPsâ„¢) was dispatched to the site.
ResolutionUpon arrival, our CPP began troubleshooting and found the unit in maintenance bypass. A visual inspection showed nothing outstanding. After downloading the alarm history, multiple overload alarms were logged with some above 125%. Further review of the load on the UPS identified laser printers, air purifiers, and shredders plugged into receptacles supported by the UPS. Once these non-essential loads were removed from the UPS, there were no more overload issues. To avoid a possible return call, the CPP also performed a load test on the batteries while onsite, which all batteries passed. As for the electrical smell the customer identified, it was not related to the UPS and possibly came from another piece of equipment in the room.
Root CauseWithout knowing what the electrical infrastructure/receptacles supported by the UPS are, as well as connecting non-essential equipment into UPS supported receptacles, a business is opening themselves up to possible downtime and costly repairs. It is also best practice to track data over time during maintenance inspections to look for any trends. The PM inspection prior to this visit showed normal loads on the UPS.
Additional Readinghttps://nationwidepower.com/news/case-study-145-another-reason-why-preventive-maintenance-is-so-important-liebert-nx-40kva/
https://nationwidepower.com/news/case-study-146-when-to-upgrade-or-repair-a-ups-system-eaton-9315-ups-system/

Nationwide Power provides 24/7/365 technical support to ensure that everything operates and transitions successfully before, during, and after any power outage.

We are your critical power infrastructure partner!

Previous ArticleCase Study #154 | Check Battery Alarm Next ArticleCase Study #156 | Importance of Following Age Based Recommendations
black-bg-graphic-leftblack-bg-graphic-right