Case Study #153 | DIRFT (Doing It Right the First Time)

Case Study #153 | DIRFT (Doing It Right the First Time)

Case StudyNationwide Power™ (NP™) is the leading provider in the critical power supply industry. Our core business is the sales and service of uninterruptible power supplies and UPS batteries. Our 57,000 square foot warehouse, with over $10 million in parts and...

Case Study #151 | The Cost of Deferred Maintenance

Case Study #151 | The Cost of Deferred Maintenance

Case Study In this Nationwide Power™ Case Study, we show the importance of performing preventive maintenance and completing recommendations. This case study is about a Mitsubishi 9900A 150kVA UPS. After several attempts over the course of many months trying to...

Case Study #150 | The Importance of Prevention

Case Study #150 | The Importance of Prevention

Case Study Nationwide Power™ is the leading provider in the critical power supply industry. Our core business is the sales and service of uninterruptible power supplies and UPS batteries, along with supporting other critical power components such as emergency...

Case Study #148 | The Cost of Deferred Maintenance

Case Study #148 | The Cost of Deferred Maintenance

Case Study In this Nationwide Power™ Case Study, we show the importance of routine maintenance and its impact on the overall health and life of UPS systems. This case study specifically looks at the Toshiba 1600EP 22kVA UPS. A new customer reached out to our team...

Solutions

Feedback

April 28, 2022

"My manager was surprised and happy that during a power outage (crisis for us), that he had the SAME tech he had spoken to before, and the tech was familiar with the equipment. The tech easily talked them through the reset application. Thanks so much."

View All - Jeannie H
North Carolina

Newsletter

Sign up below to stay informed with latest industry trends, products, and news.



Pin It on Pinterest