Case Study
Case Study #116 | CS – NXL Battery DCUV
Product | Liebert NXL Series UPS |
Application | Healthcare / Datacenter |
Synopsis | Client found the alarms / condition of unit as: UPS in bypass, Battery breaker 1 open, Low battery shutdown, Rectifier fault. Customer had a blip to the load and lost some of the data center. |
Preliminary Actions | Upon arrival, found UPS in Bypass Mode. |
Resolution | Recommendation to customer to order replacement batteries. |
Root Cause | The system’s batteries are 4 years old and very weak. With actual load current, suspect batteries did not hold load and immediately dropped to DC Under-Voltage (DCUV) / low voltage shutdown.
Although battery voltage may look good while on-line and charging, this is not always indicative of good batteries. Age and usage of the batteries has gotten them to a point of diminished capacity, and inability to support the load. NP recommends that customers plan for budgetary battery replacements due to age prior to battery capacity becoming compromised due to age. Also recommend customer give consideration to UPS 101 Critical Power customer training in order to better understand system functionality and operation. |
Nationwide Power provides 24/7/365 technical support to ensure that everything operates and transitions successfully before, during, and after any power outage.
Request a quote Call | 800-868-2780 E-Mail
We are your critical power infrastructure partner!
Latest News
The Winter Advantage: Why Replacing UPS Batteries During Winter Is a Smart Move
News Article As the winter season approaches, it's an ideal time to contemplate the maintenance of your Uninterruptible Power Supplies (UPS) and, more specifically, the replacement of UPS batteries. UPS systems are a crucial component of safeguarding your...
Nationwide Power Honored as a Top Workplace for the Second Consecutive Year
News Article Corks are popping, and the excitement is overflowing at Nationwide Power as we celebrate a remarkable achievement. For the second year in a row, our organization has been named a Top Workplace, solidifying our position as a leader in creating a culture of...
Case Study #156 | Importance of Following Age Based Recommendations
Case StudyIn this Nationwide Power™ (NP™) case study, we highlight the importance of following your service provider’s age-based components. The most common age-based components are batteries (every 3-5 years), fans (every 5 years), capacitors (every 5-7 years), and...
Newsletter Signup
0 Comments